Solved : Schedule the 30th of each month and the last day of Feb


4 replies to this topic

#1 Logan

    Newbie

  • Members
  • 2 posts

Posted 06 June 2008 - 08:50 PM

Hi,

Is there a way to schedule a task for the 30th each month with the exception of February to run at month end being that it has 28 days?

#2 gremlins

    Junior Member

  • Members
  • Pip
  • 36 posts
  • Gender:Male
  • Location:BLOIS

Posted 10 June 2008 - 11:09 AM

hi

in your rule : last day of the month

period : month
position in the period : 1 day by the end

#3 Stefan Füßgen

    Junior Member

  • Members
  • Pip
  • 28 posts
  • Gender:Male
  • Location:Cologne (Köln)

Posted 10 June 2008 - 02:56 PM

Hello,

define the following rule

Period: 1 Month
Position in period: 30 Calendar days from Beginning
Offset: Previous
Days of Week: All checked
Days in Month: 28, 29 and 30 checked
Month in year: All checked

I think this will help. But only if you have the right Universe Version.
Stefan Füßgen
Spoiler
Using $Universe 5.x on UNIX/Linux/Windows with Korn Shell and Windows Script
Preferred GUI: Motif

#4 men

    Hero Member

  • Root Admin
  • PipPipPipPip
  • 4,389 posts
  • Gender:Male
  • Location:Europe

Posted 10 June 2008 - 04:49 PM

Hello,

this solution should work with all versions of Dollar Universe:

Define the Task with 2 Rules

Rule 1 - for 30th of the Month:

Period: 1 Month
Position in period: 30 Calendar days from Beginning
Offset: None
Days of Week: All authorized

Rule 2 - for 28th of February:

Period: 12 Months
Position in period: 59 Calendar days from Beginning
Offset: None
Days of Week: All authorized

and the application date of this Rule must be set to a January 1st.

Michel

#5 Logan

    Newbie

  • Members
  • 2 posts

Posted 10 June 2008 - 09:51 PM

Thanks..I will try these out