	<item>
		<title>Put task on hold if previous instance failed</title>
		<link>http://www.orsypforum.com/index.php?showtopic=2109</link>
		<description><![CDATA[Hi,<br /><br />we have to schedule our process every hour but if it fails, next instances should not run until the one who failes has been restarted succesfully.<br /><br />We then created a script to disable the process if it fails and one to enable it when it ends in success.<br /><br />Is there an easier way to do this ? (we have a lot of sessions and wnat to avoid to do this on all uproc)<br /><br />Thanks.]]></description>
		<pubDate>Thu, 06 May 2010 23:56:05 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=2109</guid>
	</item>
	<item>
		<title>Solved : Oracle stored procedures</title>
		<link>http://www.orsypforum.com/index.php?showtopic=2119</link>
		<description><![CDATA[Hi all,<br />    I am new to dollar universe and I want to know whether we can schedule <br />oracle store procedures by using $U.<br /><br /><br />Thanks in advance,<br />        Madhulika.]]></description>
		<pubDate>Tue, 18 May 2010 20:17:13 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=2119</guid>
	</item>
	<item>
		<title>Solved : Job must not run on the 3 first working days of each month</title>
		<link>http://www.orsypforum.com/index.php?showtopic=2053</link>
		<description><![CDATA[Hello, <br /><br />I need to schedule the following rule :<br /><br />Process must run each working days of the month, except the 3 first working days of this month.<br /><br />Is there a simple way to manage this by the rule ?<br />Because today I notice we can easily exclude the 3 first calendar days of the month with the new tab "Days in Month", but I need the same with Working Days.<br />By the same way, the task today doesn't allow to exclude non explicit dates.<br /><br />I know there's some other solution for this (like create a dedicated calendar with 3 first working days off) but I just want if there's a more simple and optimized way to do it <img src="http://www.orsypforum.com/style_emoticons/default/smile.gif" style="vertical-align:middle" emoid=":)" border="0" alt="smile.gif" /><br /><br />Thanks for advice !]]></description>
		<pubDate>Wed, 14 Apr 2010 10:34:56 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=2053</guid>
	</item>
	<item>
		<title><![CDATA[Solved : Missing Saturday & Sunday Launches]]></title>
		<link>http://www.orsypforum.com/index.php?showtopic=2169</link>
		<description><![CDATA[Hi,<br />I have a Task I am currently testing in the Applications area.  This task is currently set to disabled but I am tracking the Launches being generated each day to verify correct scheduling. The task was created on Tuesday, and a launch entry was created for Wed, Thu, Fri,  Mon (today), and Tue (for tomorrow following today's execution window) but not for Saturday or Sunday.  The rule being used is TV4_J, which is the same rule a task in the Production area is using that has been generating the launches everyday correctly. I have reviewed the rule and everyday is checked off for Worked, Closed, and Holiday.  Here is the uxshw RUL:<br /><!--fonto:Courier New--><span style="font-family:Courier New"><!--/fonto--><br /> TYPE  | rul<br /><br /> ITEMS | rul          : TV4_J<br />       | label        : Calendar days<br />       | period       : (1d)<br />       | pos          : (+1w)<br />       | offset       : n<br />       | autho        : (yyy,yyy,yyy,yyy,yyy,yyy,yyy)<br />       | authom       : (1,2,3,4,5,6,7,8,9,10,11,12)<br />       | authod       : +(1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29,<br />30,31)<br />       |<!--fontc--></span><!--/fontc--><br /><br />I am currently using DU 5.3.3 on a Windows Server environment, and any help you can provide would be greatly appreciated.<br /><br />-Bill]]></description>
		<pubDate>Mon, 28 Jun 2010 21:25:03 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=2169</guid>
	</item>
	<item>
		<title>Solved : Regarding RULES : 2nd day of month</title>
		<link>http://www.orsypforum.com/index.php?showtopic=2071</link>
		<description><![CDATA[Hello , <br /><br />  If I create a rule with the period as <b><i>1</i></b> <b><i>Month</i></b> and <br />              Position in period <b>2</b><i></i> <i>Calendar</i><b></b> days from <i><b>Beginning</b></i><br />                 Offset to <b><i>None</i></b> . <br />and days of week , days in month , month in year enabled everything.<br /><br />Will it run on every 2nd of every month ?]]></description>
		<pubDate>Mon, 19 Apr 2010 14:02:22 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=2071</guid>
	</item>
	<item>
		<title>Solved : Erase Launch Production</title>
		<link>http://www.orsypforum.com/index.php?showtopic=2040</link>
		<description><![CDATA[Hello, <br /><br />we are moving or migratinf our dollar universes production nodes to another new machines, and everything seems to works fine.<br /><br /><b>But I have made a mistake, and ERASE all the planifications from these nodes, because I dont want to execute nothing from the tasks that we have migrated. These nodes are not in prodcution yet</b><br /><br />When I have erased all the calculated taks, I stop the calculator and launcher engines, and make my proves, and everithig works.<br /><br />But when I have started the calculator engine again, only calculates from the point time that I have erased, a few hours later, and then the xalculator engines only calculates tasks from the future, but the deleted planifications never more are calculated.<br /><br />With proceses that execute day by day, no problem,  we migrate on 10 days, so they are going to be calculated tomorrow again.<br /><br />The problem is with the month tasks, semanal, etc.<br /><br />The point I want to reach: is there anything we can do to "recalculate" everything from a point in the time from the past, for example, today at 10:00 AM????<br /><br />Thanks for your  help, really need.  <img src="http://www.orsypforum.com/style_emoticons/default/mellow.gif" style="vertical-align:middle" emoid=":mellow:" border="0" alt="mellow.gif" />]]></description>
		<pubDate>Thu, 08 Apr 2010 16:47:05 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=2040</guid>
	</item>
	<item>
		<title>Solved : Calendar Definition</title>
		<link>http://www.orsypforum.com/index.php?showtopic=1092</link>
		<description><![CDATA[Hi,<br /><br />"upd_calendarsV10.ksh" is one of several scripts provided to us during the implementation and we now must maintain. With little or no document going with this, I need you experts out there to help me to understand what it is doing.<br /><br />${UXEXE}/uxupd CAL NODE=${B_NODE} ${B_APP} MU=&#092;" 00&#092;" dsince="2005/01/01" dbefore="2015/12/31" attr=h to=w<br /><br />Q1: Is it better to use <b>MU=" "</b> rather than MU=&#092;" 00&#092;"?<br />Q2: Is it better to use <b>SINCE=2005 BEFORE=2016</b> rather than DSINCE ... DBEFORE ...?<br />Q3: How can we use MU=" 00" the default calendar, and update every Holiday to Workingday? Which operation will be the last?<br />Q4: Without MU=" 00", would we get the default calendar anyway ... when we first install the node?<br /><br />Thanks!]]></description>
		<pubDate>Mon, 01 Mar 2010 23:22:51 +0100</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=1092</guid>
	</item>
	<item>
		<title>Solved : Bank holiday reminder</title>
		<link>http://www.orsypforum.com/index.php?showtopic=1003</link>
		<description><![CDATA[Is it possible to create a rule so that a UPROC runs 2 (or 3 days) before a bank holiday?<br /><br />Need to send an email reminder just before a bank holiday so that staff remember to do something. <br /><br />Fairly easy to set up a UPROC to send an email the tricky bit is the scheduling. Can create a rule so that the UPROC only runs on bank holidays (Mon- Fri), however this is not much use as a reminder as it is too late. <br /><br />What is needed is for the UPROC to run say 2 (or 3) working days before the bank holiday. <br /><br />This can be done with a script testing the days in advance to their type and sending an email if 2 days in advance is a bank holiday, but this seems a little heavy handed. Is there a way to do this using rules?<br /><br />$U version 5.2.3<br /><br />Current rule is <br />Period 1 days<br />Position 1 Calender, Beginning<br /><br />           Working   Closed      Holiday<br />Mon          N            N              Y<br />Tue           N           N               Y<br />Wed          N            N              Y<br />Thu           N            N               Y<br />Fri             N            N               Y<br />Sat            N            N               N<br />Sun            N            N               N<br /><br />Offset None]]></description>
		<pubDate>Tue, 05 Jan 2010 13:22:04 +0100</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=1003</guid>
	</item>
	<item>
		<title>Solved : Rule:If 3th is working day then offset to 4th</title>
		<link>http://www.orsypforum.com/index.php?showtopic=1001</link>
		<description><![CDATA[Hello,<br />I need to create a task with the following rule:<br />execution the 3th of every month if it's a business day then offset to the 4th regardless if the 4th is a business day or not.<br />Note that I am under Dollar Universe 5.1.3<br />Thank you for your help]]></description>
		<pubDate>Mon, 28 Dec 2009 11:03:22 +0100</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=1001</guid>
	</item>
	<item>
		<title><![CDATA[Solved : Create or update of a calendar failing with "ocx" error]]></title>
		<link>http://www.orsypforum.com/index.php?showtopic=989</link>
		<description><![CDATA[Hello,<br /><br />On Windows, when I create or update a calendar I get  an error mentioning failed "msflxgr.ocx".<br /> <br />Does anyone know where this error is coming from ?<br /><br />H]]></description>
		<pubDate>Tue, 15 Dec 2009 12:26:29 +0100</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=989</guid>
	</item>
	<item>
		<title>Solved : Rules Export - Import</title>
		<link>http://www.orsypforum.com/index.php?showtopic=988</link>
		<description><![CDATA[Hi,<br /><br />Is there a way to export - import rules from one mahcine to another.<br /><br /><br />Regards]]></description>
		<pubDate>Tue, 15 Dec 2009 07:23:43 +0100</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=988</guid>
	</item>
	<item>
		<title>Solved : Create Role YEAR</title>
		<link>http://www.orsypforum.com/index.php?showtopic=848</link>
		<description>I want to create a Rule that launch uproc orsyp exactly once a year August 31 of each year, you know how can I do?</description>
		<pubDate>Tue, 13 Oct 2009 14:06:33 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=848</guid>
	</item>
	<item>
		<title>Solved : Create New Rule Help!</title>
		<link>http://www.orsypforum.com/index.php?showtopic=713</link>
		<description><![CDATA[Unless I am presenting is a user Dollar Universe society lottomatica (Italy).<br /><br />I need to create a rule with the following characteristics:<br /><br />5 months of February, May, August, November.<br /><br />there is a method of creating the rule?<br />how can I solve my problem?<br />thank. <img src="http://www.orsypforum.com/style_emoticons/default/wacko.gif" style="vertical-align:middle" emoid=":wacko:" border="0" alt="wacko.gif" />]]></description>
		<pubDate>Tue, 01 Sep 2009 11:54:57 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=713</guid>
	</item>
	<item>
		<title>Solved : Help on setting provoked tasks</title>
		<link>http://www.orsypforum.com/index.php?showtopic=739</link>
		<description><![CDATA[Hi Michel , <br /><br />   Could you please provide the step-by-step process of "Provoked Uproc". If that is given in any other thread, you can give that reference.<br /><br />Thanks man.<br /><br /><br /><br />regards,<br />sanjeev.]]></description>
		<pubDate>Tue, 22 Sep 2009 15:47:59 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=739</guid>
	</item>
	<item>
		<title>Solved : Changing task type from Scheduled to Provoked</title>
		<link>http://www.orsypforum.com/index.php?showtopic=667</link>
		<description><![CDATA[Hi, <br /><br />I seem to be unable to change the task type using motif interface. <br />Is there a reason behind that?<br />Changing using the uxupd tsk command works.<br /><br />Thanks, <br />Julie]]></description>
		<pubDate>Fri, 10 Jul 2009 18:56:09 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=667</guid>
	</item>
	<item>
		<title>Tutorial : Scheduling Rules</title>
		<link>http://www.orsypforum.com/index.php?showtopic=658</link>
		<description><![CDATA[Hello,<br /><br />Please find a document to help you build Rules within Dollar Universe.<br /><br />Feel free to ask for any additional information <img src="http://www.orsypforum.com/style_emoticons/default/smile.gif" style="vertical-align:middle" emoid=":)" border="0" alt="smile.gif" /><br /><br />Michel]]></description>
		<pubDate>Tue, 07 Jul 2009 16:26:30 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=658</guid>
	</item>
	<item>
		<title>Session not runnig as scheduled</title>
		<link>http://www.orsypforum.com/index.php?showtopic=652</link>
		<description><![CDATA[Hi,<br /><br />we  have a session(contains 3 uprocs) which runs every day.yesterday we observed errors in job log for 2 uprocs.we resolved the errors and force launched the uprocs individually.Today when we checked the session in job montor only header uproc is completed state remaining 3 uprocs and tailer uproc didn't ran.<br />please give us the solution so that it will run daily.<br /><br />thanks in advance<br /><br />Regards<br />Srinivas]]></description>
		<pubDate>Tue, 30 Jun 2009 13:34:19 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=652</guid>
	</item>
	<item>
		<title>Solved : Multi-launch Task with different processing date?</title>
		<link>http://www.orsypforum.com/index.php?showtopic=541</link>
		<description><![CDATA[Hi,<br /><br />is it possible to create a multi-launch Task with a different processing date in relation with the launch window time?<br /><br />For instance, have the processing date on the previous day if launch window starts before noon, have processing date on the current day if launch window starts after noon.]]></description>
		<pubDate>Tue, 07 Apr 2009 11:04:26 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=541</guid>
	</item>
	<item>
		<title>Solved : Right frequency but wrong schedule</title>
		<link>http://www.orsypforum.com/index.php?showtopic=538</link>
		<description><![CDATA[Hello,<br /><br />I have created a Rule "First day of the month" for a Task, but its simulation is not correct: running once a month, but not on the 1st! What have I done wrong?<br /><br />Andi]]></description>
		<pubDate>Fri, 03 Apr 2009 13:31:29 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=538</guid>
	</item>
	<item>
		<title>Solved : Multiple launches of a Task not working</title>
		<link>http://www.orsypforum.com/index.php?showtopic=537</link>
		<description><![CDATA[Hello,<br /><br />I need to schedule a Task with mulitple launches (4 times a day at 08am, 10am, 12pm, 02pm).<br /><br />To do so I've create a Task with multiple launches and a launch window of 24 hours. <br /><br />But what happens is that the task only executes once a day. I have the feeling that the Calculator waits for the end of the launch window to calculate the next launch. Is my guess right?]]></description>
		<pubDate>Thu, 02 Apr 2009 15:10:01 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=537</guid>
	</item>
	<item>
		<title>Solved : How to build a rule to run a job the first 5 days of each month except Sundays?</title>
		<link>http://www.orsypforum.com/index.php?showtopic=536</link>
		<description><![CDATA[Hello,<br /><br />How can I build a rule to run a job the first 5 days of each month except Sunday?<br /><br />I'm running DollarU 5.1.3.]]></description>
		<pubDate>Thu, 02 Apr 2009 14:37:47 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=536</guid>
	</item>
	<item>
		<title>different time zones on server</title>
		<link>http://www.orsypforum.com/index.php?showtopic=509</link>
		<description><![CDATA[Hi together,<br /><br />we have some $U environments with tasks for different time zones.<br />For example: the server time is EDT (US Eastern Daylight Time), with a lot of tasks based on that time. Other tasks are running for Brazil. Right now they have winter time, their time zone is BRT, with an offset of +1 hour to the server time.<br />The offsets to Germany ( to my GCO client) is -5 h for EDT and -4 h for BRT. Germany is changing to Daylight time on March, 29th.<br />When times are changing from winter to summer time and vice versa, the offsets change, too. Then we have to change the schedules of the tasks manually.<br /><br />So now: <br />How can I use the time zone feature of $U in order to leave the schedules as they are and just change the offsets twice a year? I know I can define MUs with offsets but are quite confused with the displays of Global control and Graphical Job Monitor.<br />Which times appears when I want to launch a job?<br />What about the processing day when the launch is around midnight? Rules?<br /><br />We use one GJM to display all $Us in one environment. So we have servers with German, Shanghai and US times. When I switch the display to MU-Time and use an offset for the display (e.g. completed jobs of the last 5 hours), the calculation of the display  is based on the time of my GJM. That means I miss jobs of the American server. Also I see too much jobs of the Shanghai server.<br /><br />Quite difficult, isn't it?<br /><br />I really hope someone can help.<br /><br />Installations: $U 513 with patches, $U 533 with patches, GCO 2.4<br /><br />Best regards<br />Monika]]></description>
		<pubDate>Tue, 17 Mar 2009 12:19:10 +0100</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=509</guid>
	</item>
	<item>
		<title>Solved : Strange processing date with rule simulation</title>
		<link>http://www.orsypforum.com/index.php?showtopic=471</link>
		<description><![CDATA[We have a problems with the processing day that one rule applies. <br />The name of the rule is MT3SAMES, and here is it's configuration.<br />Period : 1 Month<br />Position in period : 15 Calendar<br />Days of the week: Saturday<br />If a job is using this rule, for February, we expect this job to be scheduled for 21.02.2009 (this is the first Saturday after the 15-th of February). The schedule is correct, but the processing date is 15.02.2009, not what we expect 21.02.2009]]></description>
		<pubDate>Mon, 23 Feb 2009 15:21:00 +0100</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=471</guid>
	</item>
	<item>
		<title>Solved : What is Automatic Restart.</title>
		<link>http://www.orsypforum.com/index.php?showtopic=447</link>
		<description><![CDATA[Hi all.<br /><br />I wanted to know what is Automatic Restart when a Task is created ?]]></description>
		<pubDate>Thu, 05 Feb 2009 05:26:01 +0100</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=447</guid>
	</item>
	<item>
		<title>Solved : Expanding Calendars</title>
		<link>http://www.orsypforum.com/index.php?showtopic=323</link>
		<description><![CDATA[Hello,<br /><br />I need to expand calendars of my $Universe company, icnluding the General Calendar. I can't seem to find the option in the GUI.<br /><br />Can you help?]]></description>
		<pubDate>Thu, 06 Nov 2008 12:39:05 +0100</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=323</guid>
	</item>
	<item>
		<title>Solved : Rule Monday - Saturday</title>
		<link>http://www.orsypforum.com/index.php?showtopic=306</link>
		<description><![CDATA[How can i create a new rule Monday - Saturday via the GUI<br /><br />Help much appreciated]]></description>
		<pubDate>Wed, 29 Oct 2008 22:01:24 +0100</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=306</guid>
	</item>
	<item>
		<title>Solved : Rule portability</title>
		<link>http://www.orsypforum.com/index.php?showtopic=243</link>
		<description><![CDATA[Is there a way to share rules defined on one node to other nodes?  The rules section clearly is lacking a 'distribute' function that exists for other $U objects.  Are they contained in a text or database file that can be copied?<br /><br />It seems a real shame to have defined a whole bunch of rules to have to recreate them with all the risk of typos etc.<br /><br />Paul]]></description>
		<pubDate>Fri, 19 Sep 2008 09:52:50 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=243</guid>
	</item>
	<item>
		<title>Solved : Problem adding a Scheduling Rule</title>
		<link>http://www.orsypforum.com/index.php?showtopic=241</link>
		<description><![CDATA[Hello,<br /><br />I would like to add a rule to an existing task on $U with the command uxupd<br /><br />uxupd TSK EXP SES=SESSION1 UPR=UPROC1 MU=MU1 IMPL ADD RULE=("RULE1",09172008)<br /><br />U_FMT_DATE = mm/dd/yyyy<br /><br />But when executing the command, i'm getting the error below:<br />syntax error at line 2 : &#96;(' unexpected<br /><br />Can you please help me out?<br /><br />Thanks]]></description>
		<pubDate>Wed, 17 Sep 2008 10:37:14 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=241</guid>
	</item>
	<item>
		<title>Can not execute any UPROC</title>
		<link>http://www.orsypforum.com/index.php?showtopic=222</link>
		<description><![CDATA[Hi all,<br /><br />I am trying to run a defined UPROC but it 's not running/ not executing<br /><br />see the error in the universe.log file while i am trying to execute a session ,<br /><br />%UNI_-E-U_UIDTSK0501, This task is not scheduled<br /><br /><br />Any idea , please .]]></description>
		<pubDate>Fri, 22 Aug 2008 12:04:45 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=222</guid>
	</item>
	<item>
		<title>Solved : Multiple schedule day depending (5x 14:00, 7x 21:00 week based)</title>
		<link>http://www.orsypforum.com/index.php?showtopic=134</link>
		<description><![CDATA[We can't schedule a task that according to this pattern:<br /><br />Mo / Fr: 14:00 and 21:00<br />Sat & Sun: only at 14:00<br /><br />2 Tasks could not be created because the session name is the same (duh)<br /><br />anybody got a idea?<br /><br /><br />Kind regards,<br /><br />Edward Moll]]></description>
		<pubDate>Thu, 05 Jun 2008 15:31:38 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=134</guid>
	</item>
	<item>
		<title>is possible to add 30 rules in one task?</title>
		<link>http://www.orsypforum.com/index.php?showtopic=176</link>
		<description><![CDATA[Hello,<br /><br />we need to define a task with 30 rules, is it possible? <br /><br /><br />Thanks in advance!]]></description>
		<pubDate>Mon, 21 Jul 2008 16:38:59 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=176</guid>
	</item>
	<item>
		<title>Solved : every day except 1st of month</title>
		<link>http://www.orsypforum.com/index.php?showtopic=173</link>
		<description><![CDATA[Hi,<br /><br />is there a way to schedule a job every day except the 1st of each month?<br /><br />Thanks!]]></description>
		<pubDate>Thu, 17 Jul 2008 17:45:14 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=173</guid>
	</item>
	<item>
		<title>Solved : 1st two working days of the month</title>
		<link>http://www.orsypforum.com/index.php?showtopic=170</link>
		<description><![CDATA[Hi All,<br />Is there any way to create just a single rule for a single task? <br /><br />I have tried this method on V5.3, it didn't work well --&gt;<br /><br />Period: 1 Day<br /><br />Position in period: 1 Working Day from Beginning<br /><br />Offset: None<br /><br />Days of the week: Monday to Friday (worked)<br /><br />Days in month: 1st and 2nd from beginning<br /><br />Months of the Year: Checked all]]></description>
		<pubDate>Wed, 16 Jul 2008 05:35:59 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=170</guid>
	</item>
	<item>
		<title>Solved : Schedule the 30th of each month and the last day of Feb</title>
		<link>http://www.orsypforum.com/index.php?showtopic=135</link>
		<description><![CDATA[Hi,<br /><br />Is there a way to schedule a task for the 30th each month with the exception of February to run at month end being that it has 28 days?]]></description>
		<pubDate>Fri, 06 Jun 2008 21:50:36 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=135</guid>
	</item>
	<item>
		<title>Solved : 2nd Monday of each month</title>
		<link>http://www.orsypforum.com/index.php?showtopic=137</link>
		<description><![CDATA[Hi,<br /><br />is there a way to schedule a job the 2nd Monday of each month?]]></description>
		<pubDate>Mon, 09 Jun 2008 16:28:17 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=137</guid>
	</item>
	<item>
		<title>Solved : Schedule job the 1st working day of the 2nd month of each quarter</title>
		<link>http://www.orsypforum.com/index.php?showtopic=114</link>
		<description><![CDATA[Hi,<br /><br />I would like to schedule a job the 1st working day of the 2nd month of each quarter.<br /><br />So I should get the 1st working day of February, May, August & November.<br /><br />Is it possible?<br /><br />Cheers!]]></description>
		<pubDate>Fri, 23 May 2008 16:44:08 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=114</guid>
	</item>
	<item>
		<title>Solved : Rule for 1st working Thursday after 1st Wednesday of the month</title>
		<link>http://www.orsypforum.com/index.php?showtopic=113</link>
		<description><![CDATA[Hello,<br /><br />Is it possible to create a Rule for this scheduling?]]></description>
		<pubDate>Wed, 21 May 2008 11:07:14 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=113</guid>
	</item>
	<item>
		<title>Solved : How to build a rule to run a job the first 5 days of each month?</title>
		<link>http://www.orsypforum.com/index.php?showtopic=111</link>
		<description><![CDATA[Hello,<br /><br />How can I schedule a job the first 5 days of each month?]]></description>
		<pubDate>Thu, 15 May 2008 17:11:56 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=111</guid>
	</item>
	<item>
		<title><![CDATA[Announcement : New features on Rules & Tasks in 5.3]]></title>
		<link>http://www.orsypforum.com/index.php?showtopic=83</link>
		<description><![CDATA[Hi,<br /><br />I've checked the release notes of 5.3 and found several interesting enhancements on Rules and Tasks.<br /><br />You now can define a Rule which applies only to specific days in the month (eg: the 5th, 10th to 20th, 25th of the month) or only to specific months in the year (eg: 1st on the month except for August).<br /><br />There is also the possiblity to define parallel Tasks where next launch is calculated at the begining of the Launch window, and not at the end anymore, which can prove useful for multi-launch Tasks.<br /><br />Last but not least, you can define cyclical Tasks which are a nice complement to the existing categories.<br /><br /> Kenny]]></description>
		<pubDate>Wed, 23 Apr 2008 11:38:05 +0200</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=83</guid>
	</item>
	<item>
		<title>Solved : Tasks not calculated or calculated after a long time</title>
		<link>http://www.orsypforum.com/index.php?showtopic=30</link>
		<description><![CDATA[Hi,<br /><br />Got a problem: some scheduled or optional tasks are not calculated or are calculated only after a long time.<br /><br />Someone can help me?<br /><br />Thanks]]></description>
		<pubDate>Wed, 26 Mar 2008 16:58:16 +0100</pubDate>
		<guid>http://www.orsypforum.com/index.php?showtopic=30</guid>
	</item>